Goodrington Sands Toilets

About This Project

We worked closely with Torbay Council and Healthmatic on this project. We had input as early as the design stage assisting the client with various items that affected this challenging site including identifying the need for and installing sewage pumping station. From this we installed the base all drainage, sited the unit installed all paths ect to create the finished article that is evident on goodrington seafront today. We worked hard to minimise the impact on the local community by carrying out the works wherever possible outside of the school holidays and made sure it was open for the summer rush.

Category
Construction